Bee’s Knees MiningHosting • Home Miners • ASICUI preview — live data wiring next
Fleet & Capacity Overview
A clean operator view of power, hashrate, and site lifecycle — built to feel like Foreman, but tailored to Bee’s Knees. Live pulls are coming next.
Total Capacity
1,200 kW
Planned ceiling across all sites
Live Draw
132 kW
Current measured load (active site)
BTC Hashrate
0.975 PH/s
SHA-256 fleet snapshot
Headroom
1,068 kW
Available build capacity (planned vs live)
Hashrate
BTC + ALEO trend (placeholder)
Next: time range (24h/7d/30d), coin toggles, per-site breakdown.
Pool Health
Accepted / stale / rejects (placeholder)
Next: real pool stats, acceptance rate, and miner-level errors.
Hive Sites
Active • Under construction • Planning (ordered by lifecycle)
The Brooding Room
ACTIVE100AAIR-PASSIVEALL-IN $0.12/kWh
Capacity
24 kW
Draw
22 kW
Headroom
2 kW
Production is live. Hosting opens as headroom becomes available.
The Ashen Comb
UNDER CONSTRUCTION400AAIR-PASSIVEALL-IN $0.075/kWh
Capacity
96 kW
Draw
0 kW
Headroom
96 kW
Build-out in progress: power, airflow, and rack layout staging.
The Royal Forge
PLANNING3-PhaseHYDROALL-IN (EST.) $0.095/kWh
Capacity
1080 kW
Draw
0 kW
Headroom
1080 kW
Site design in motion: hydro layout, power planning, and scale model.
Need a place to run your ASIC?
We quote power (kW), cooling approach, and expected uptime — then onboard your unit with clear operator visibility.