
Colocation
Utah air-cooled capacity online (BTC + ALEO). Texas hydro pods coming online (hydro ASICs only).
Utah — Air-cooled
n / 40
BTC + ALEO (Utah-only ALEO)
View Utah breakdown →
Texas — Hydro
0 / 5
Hydro ASICs only (no ALEO)
Hosting Packages
Simple, transparent pricing by miner tier. Power, network, and monitoring included.
AE0
$60/mo
- • Entry rigs & test units
- • Air-cooled bay
- • Uptime monitoring
AE1
$100/mo
- • Mid-range ASICs
- • Performance tuning
- • Pool & wallet support
AE2
$140/mo
- • High-draw or performance rigs
- • Priority support
- • Best thermals & airflow lanes
FAQ
Is ALEO available in Texas?
Not at launch. ALEO is currently available only in our Utah air-cooled facility. Texas is for hydro ASICs.
What’s included in the monthly fee?
Power, network, basic monitoring, and on-site handling. Advanced services (repasting, firmware changes, board swaps) are available on request.
When will Texas hydro be available?
Hydro pods are staged in Texas. We’ll email the waitlist as slots open; Hydro targets 5 units in the first pod.
Which miners do you support?
S19/S21 family and similar ASICs are ideal for Utah air-cooled. Higher-density or hydro-ready units will be slotted for Texas.
© 2025 Bee’s Knees LLC • Utah, USA